# @datastore("txt") @source("C:\Users\Dhiagan Chetty\OneDrive\ARKILIBRIUM FILES AND DOCUMENTS\Library\Revit\Keynotes\2020 Keynotes\ARKILIBRIUM - KEYNOTES.txt") @version("0.1") @encoding("UTF-16")
# ===================== @db(txn_db:"Internal DB")
# --------------------- @table(locks_table:"Locks Table") @sep("\t") @internal(yes) @tags(yes) @history(no) @encap(no) @headers(no) @key(lock_uuid) @uuid(lock_uuid:"") @text(lock_source:"") @text(lock_requester:"") @uuid(lock_conn_uuid:"") @text(lock_dbname:"") @text(lock_tablename:"") @text(lock_recordkey:"")
# ===================== @db(keynotesdb:"pyRevit Keynotes Manager DB")
# --------------------- @table(categories:"Root Keynotes Table") @sep("\t") @internal(no) @tags(no) @history(no) @encap(no) @headers(no) @key(cat_key) @text(cat_key:"") @text(cat_title:"")
000	Sitework
100	Structure
200	Openings
300	Finish
400	Sanitary Ware and Plumbing Fixtures
500	Roofs and facias
600	Speciality
700	Fire and Safety
800	Screens and Shading Devices
900	Wall Cladding
1000	Gutters and drainage
1100	Electrical
F	FLOOR FINISH
S	SKIRTING FINISH
W	WALL FINISH
WT	WALL TYPES
CR	CORNICE FINISH
C	CEILING FINISH
-	References
PW	PARTITION WALLS
TR	TRIMS
TR01	PS1 Shadowline used with econogrid. Ceiling perimeter to be finished with pre-painted Shadowline wall trim. An aluminium ceiling profile designed to create a 20 x 20mm Shadowline between an exposed suspended ceiling and the perimeter wall.
TR02	PS2 Plaster Trim 25 x 20. Supply and install Pelican PS2 Shadowline pre-drilled & pre-painted aluminium white Shadowline Wall Trim to perimeter of rooms fixed at 450mm centres with wall anchors.
TR03	PS35 Plaster Trim 35 x 35. Supply and install Pelican PS35 Shadowline pre-drilled & pre-painted aluminium white Shadowline Wall Trim to perimeter of rooms fixed at 450mm centres with wall anchors.
TR04	PS3 Plaster Trim 45 x 20. Supply and install Pelican PS3 Shadowline pre-drilled & pre-painted aluminium white Shadowline Wall Trim to perimeter of rooms fixed at 450mm centres with wall anchors.
AP	CEILING ACCESS PANELS
TR06	Supply and install Pelican PS100 Shadowline pre-drilled & pre-painted aluminium white Shadowline Wall Trim to perimeter of rooms fixed at 450mm centres with wall anchors.
TR08	Supply and install Pelican pre-painted White Steel Plaster Trim for 9mm JUMBO Board to perimeter of rooms fixed at 400mm centres with wall anchors.
TR07	Supply and install Pelican pre-painted White Steel Plaster Trim for 7mm JUMBO Board to perimeter of rooms fixed at 400mm centres with wall anchors.
TR09	Supply and install Pelican pre-painted White Steel Plaster Trim for 12mm JUMBO Board to perimeter of rooms fixed at 400mm centres with wall anchors.
TR10	Supply and fit white epoxy coated aluminium Pelican Fascia Trim between horizontal ceiling and vertical bulkhead, vertical stand to be 16mm chipboard or supawood. Suspend Fascia Trim from slab at 1200mm centres with 38 x 25 x 0.8mm G.M.S angles.
TR11	Supply and fit white epoxy coated aluminium Pelican Apex Trim between two raked flush plastered/suspended ceilings. Suspend Apex Trim from trusses at 1200mm centres with 25 x 25 x 0.6mm G.M.S angles.
TR12	Supply and fit white epoxy coated aluminium Pelican Plaster Curve Trim with 16mm radiused supawood with 5 x 25mm anchors at 450mm centres.
TR13	Supply and fit white epoxy coated aluminium Pelican Shadow Curve Trim with 16mm radiused supawood with 5 x 25mm anchors at 300mm centres
TR14	Supply and fit white epoxy coated aluminium Pelican Plaster Ceiling junction between exposed suspended ceiling and flush plastered ceiling. Suspend Plaster Ceiling Junction from slab at 1200mm centres with 25 x 25 x 0.6mm G.M.S angles.
TR05	PS4 Plaster Trim 45 x 45. Supply and install Pelican PS4 Shadowline pre-drilled & pre-painted aluminium white Shadowline Wall Trim to perimeter of rooms fixed at 450mm centres with wall anchors.
C2.0	Pelican Ceiling Tiles
# --------------------- @table(keynotes:"Keynotes Table") @sep("\t") @internal(no) @tags(no) @history(no) @encap(no) @headers(no) @key(keynote_key) @text(keynote_key:"") @text(keynote_text:"") @text(parent_key:"") @wire(parent_key:cat_key) @wire(parent_key:keynote_key)
001		000
101	Foundations	100
101.1	Concrete Pile Caps to Engineer's Details and Specifications	101
101.2	Concrete Piles to Engineer's Details and Specifications	101
101.3	Concrete Foundations to Engineer's Details and Specifications	101
102	Slabs	100
102.1	285mm Thick Post Tensioned Concrete Slab to Engineer's Details	102
102.2	RC Concrete Slab to Engineer's Details and Specifications	102
102.3	RC Concrete Surface Bed to Engineer's Details and Specifications	102
103	Columns	100
103.1	Concrete	103
103.2	Steel	103
103.1.1	Reinforced Off Shutter Concrete Column to Engineer's Details and Specifications	103.1
103.2.1	Steel Column to Engineer's Details and Specifications	103.2
104	Walls	100
104.1	115mm Brickwork to engineers detail	104
104.2	230mm Brickwork to engineers detail	104
104.3	Off shutter concrete wall to engineers details	104
104.4	Retaining Wall to engineer's detail	104
104.5	300mm Brickwork to engineers detail	104
104.6	350mm Cavity Brickwork to engineers detail	104
104.7	Structural Retaining Wall to engineers detail	104
104.9	Drywall As Per data sheets and Finishing Schedule 	104
104.9.1	GypWall Classic 63/F30S42 or equally approved alternate as per manufacturers specifications. Refer to Saint Gobain Project Pack Addendum.	104.9
104.9.2	GypWall FireStop HiSpec 102/F120S52 equally approved alternate as per manufacturers specifications. Refer to Saint Gobain Project Pack Addendum.	104.9
104.9.3	Cold Room Panel Wall by specialist	104.9
105	Stairs	100
105.1	Concrete Stair to engineers details. All in accordance to SANS 10400-B,SANS 10400-D,SANS 10400-M & SANS 10400-T	105
105.2	Concrete Fire Stair to engineers details. All in accordance to SANS 10400-B,SANS 10400-D,SANS 10400-M & SANS 10400-T	105
105.3	Steel Stair to engineers details. All in accordance to SANS 10400-B,SANS 10400-D,SANS 10400-M & SANS 10400-T. Treads @ 280mm, Risers @ 170mm	105
105.4	Steel Fire Stair to engineers details. All in accordance to SANS 10400-B,SANS 10400-D,SANS 10400-M & SANS 10400-T	105
105.5	Steel Fire Stair to details. All in accordance to SANS 10400-B,SANS 10400-D,SANS 10400-M & SANS 10400-T	105
106	Lift	100
106.1	2350x2000 Service lift by specialist lift engineer	106
106.2	2180x2450 Stretcher lift by specialist lift engineer	106
106.3	Existing Service lift to later specifications and as per specialist lift engineer 	106
107	Beams	100
107.1	Concrete	107
107.1.1	Reinforced concrete beam to engineers details	107.1
107.2	Steel	107
107.2.1	Galvanised mild steel "I" beam structural framing to engineers details and specifications	107.2
108	Ramps & Bridges	100
108.1	Concrete ramps	108
108.1.1	Reinforced concrete Ramp to engineers details	108.1
108.2	Steel ramps	108
108.2.1	steel Ramp to engineers details	108.2
108.3	Steel Bridge	108
108.3.1	steel Bridge to engineers details	108.3
108.3.2	Steel "I"Beam supported structural floor to engineers details	108.3
109	Precast Concrete kerb to engineers details	100
110	Steel, Aluminium & Timber Connections	100
110.1	8mm thick Steel support brackets Bolted to RC Beam all to engineers details	110
110.2	8mm thick Steel support brackets Bolted to RC Beam using steel substructure all to engineers details	110
110.3	8mm thick Steel Bracing plate welded to steel brackets all to engineers details	110
110.4	Bolts to engineers details	110
110.4.1	M16 Bolt to engineers details	110.4
110.4.2	Approved Anchor Bolts to engineers details	110.4
110.5	Steel substructure bolted to RC beam using M16 bolts to engineers details	110
110.6	8mm substructure bolted to RC beam using M16 bolts to engineers details	110
110.7	Thick Steel plate bolted to RC beam all to engineers details	110
110.7.1	8mm thick Steel plate bolted to RC beam all to engineers details	110.7
110.7.2	450mm x 450mm x 12mm Thick Steel Base Plate Welded On At Bottom Of The Bollard Bolted To RC Floor All To Engineers Details	110.7
110.8	25mm x 25mm x 2mm Thick Aluminium Angle By specialist	110
110.9	38mm x 50mm Structural Timber Battens By specialist & to engineers details	110
110.10	230mm Dia x 4mm Wall Thickness Steel Bollard 1000mm High Filled with 10MPa Concrete And with Steel Base plate Welded on at Bottom, Four times Bolted with and Including Approved Anchor Bolts to RC Floor All By specialist & To Engineers details	110
201	Doors to schedule	200
201.1	Fire Rated Doors	201
201.1.1	2HR Fire Rated Doors By specialist to Comply With SANS 10400-T. Refer to Schedules 	201.1
201.1.2	1HR Fire Rated Door By specialist to Comply With SANS 10400-T. Refer to Schedules	201.1
201.2	Existing Double Door by specialist	201
201.3	Existing Double Door by specialist	201
201.4	Proposed Access Controlled gate by specialist	201
201.5	Glazed Aluminium Double Door by Specialist to Door Schedule to comply with SANS 10400-N and AAAMSA Regulations. Colour charcoal and glazing to be in accordance with SANS 10400-N	201
201.6	Glazed Aluminium Door by Specialist to Door Schedule to comply with SANS 10400-N and AAAMSA Regulations.	201
201.7	GMS Roller Shutter Door by specialist to Door Schedule	201
201.8	Solid Timber Door by Specialist to Door Schedule	201
201.9	Hollowcore Timber Door by specialist to Door Schedule	201
201.10	Polyvinyl Cold Room Door by specialist to Door Schedule	201
201.11	Automatic Sliding door by specialist	201
201.12	Automatic Security Turnstile by specialist	201
202	Windows to schedule	200
202.1	Existing Flush Glazed clerestory windows to specialist detail To Comply With SANS 10400-N	202
202.2	New Flush Glazed Curtain walling to specialist detail And To Comply With SANS 10400-N	202
202.3	Aluminium Frame Window to Schedule to Comply With SANS 10400-N and AAMSA Regulations. Colour Charcoal and Glazing to be in Accordance with SANS 10400-N	202
203	Curtain Walls	200
203.1	Interior Curtain Wall glazing by specialist to Comply With SANS 10400-N. Refer to Schedules	203
203.2	Exterior Curtain Wall glazing by specialist to Comply With SANS 10400-N. Refer to Schedules	203
204	Openings	200
204.1	Roof Skylights by specialist to Comply With SANS 10400-N	204
301	Off Shutter Concrete to engineers details by specialist	300
302	Plaster and Paint as per Finishing Schedules	300
302.1	paint 01	302
305	Floors	300
305.1	Nexus qualities Berber Point, 50 x 50cm Nexbac tiles, SDX nylon 100% stainproof	305
306	Tiles	300
306.1	600mm x 600mm Porcelain tiles	306
306.2	600mm x 300mm Porcelain tiles	306
306.3	spec	306
401	Urinal as per sanitary schedule.	400
401.1	Urinal Flush System as per sanitary schedule.	401
402	Wall hung WC sanitary as per schedule.	400
402.1	WC flushplate as per sanitary schedule	402
402.2	Disabled WC flushplate as per sanitary schedule	402
402.3	WC Flush System as per sanitary schedule	402
402.4	Floormounted WC as per sanitary schedule	402
402.5	Disable WC Flush Plate as per sanitary schedule	402
402.6	Disabled WC Flush System as per saniary schedule	402
402.7	Disabled Grab Rail - Straight as per sanitary schedule	402
402.8	Disabled Grab Rail - Angled as per sanitary schedule 	402
403	WHB sanitary as per sanitary schedule.	400
403.1	WHB by Specialist	403
403.2	WHB trough as per sanitary schedule	403
404	Hand dryer as per sanitary schedule.	400
405	Soap dispenser as per sanitary schedule.	400
406	Toilet cubicle as per sanitary schedule.	400
407	Bathroom Mirror by specialist 	400
408	Countertop by Specialist	400
409	Lockers as Per Specialist. 	400
410	Baby change mat as per sanitary schedule. 	400
411	External Tap with Gulley below by specialist. 	400
412	Mixers as per sanitary schedule. 	400
412.1	Shower Mixers as per sanitary schedule. 	412
412.2	Disabled Mixers as per sanitary schedule. 	412
413	Shower Head as per sanitary schedule. 	400
413.1	Shower Drain as per sanitary schedule. 	413
413.2	Disabled Handheld Shower as per sanitary schedule	413
413.3	Disabled Shower Seat as per sanitary schedule	413
414	Wash Trough as per sanitary schedule. 	400
415	Sink as per sanitary schedule. 	400
501	Roofs	500
501.1	325mm thick reinforced concrete roof slab with 100mm upstand to engineers details with one layer Derbigum SP4 waterproofing membrane to manufacturers specifications, laid to fall. including protection of 50mm thick layer of clean 19-25mm crushed stone and ISOVER EPS insulation under slab (Refer to Saint-Gobain Project Pack Addendum for manufacturers specifications)	501
501.1.1	Precast Concrete coping with drip detail by specialist	501.1
501.1.2	RC Flat Roof With Existing Screed laid to Fall to Existing drainage all as per Engineer's specifications	501.1
501.2	Steel Structure Roofs	501
501.2.1	Steel Purlins to Engineers Details	501.2
501.2.2	Galvanised Mild Steel Rafter to Engineers Details	501.2
501.2.3	Charcoal Gray 'Kliplock' sheeting @ 7.5 degrees, on 75x38mm purlins @ 1200cc, on reflective foil(double sided), on 150x38 CCA treated SA Pine Rafters @ 700cc, on 114x38 wall plate.100mm thick cellulose fibre to also be installed in ceilings.	501.2
502	Facias	500
502.1	150x12mm Fibre Cement Fascias (painted to match colour of roof)	502
502.1.1	6mm Hulabond panel	502.1
502.1.2	Aluminium Subframe	502.1
502.1.3	Support Steelwork	502.1
502.2	Hulabond facia to specialist detail	502
601	Mentis grating by specialist	600
602	Mentis grating panels to architects layout and suppliers details	600
603	Signage by Specialist	600
604	Off shutter concrete planter box by Specialist & to further details	600
605	1200x600mm Ceiling Access Hatch by Specialist	600
606	1200x1800mm Walk-Off Mat 15mm deep by Specialist	600
607	Diesel Storage Tank by Specialist	600
608	Bar and Seating to Later Detail & by Specialist	600
609	Polycarbonate Graphics to later details and by Specialist	600
610	20mm Thick Polycarbonate Panels By Specialist Fixed To RC beam using Steel Brackets Holders bolted At 45deg as per engineers details	600
611	Raised access floor as per Data sheets and by Specialist	600
612	Skylights as per Data sheets and engineers details 	600
613	Feature Light fitting as per Data sheets and to engineers specifications	600
614	Auditorium Seat as per Data sheets and by Specialist	600
615	Hybrid Range Size Trolley As Per Spar Approved National Specifications Document and by specialist	600
616	165mm High x 90mm X 1000mm Long LG Green Or Similar Approved "Half Round Mini" Rc Kerb by Specialist	600
617	Robertson Ventilator to maunfacturer's specification and detail	600
618	1.8m High ClearVu Fencing system (or similar approved) to detail to manufacturer's specification	600
619	Sliding Steel Gate system (or similar approved) by specialist to maunfacturer's specification 	600
620	Self Closing Self Latching Gate system (or similar approved) by specialist to maunfacturer's specification 	600
701	Fire Hose Reel by manufacturers specifications	700
702	Fire Extinguisher by manufacturers specifications	700
703	Min. 1000mm Balustrade As Per Balustrade layout & Details.In accordance to SANS 10400-D	700
703.1	HDGMS balustrade 1m high with horizontal round bar @ 100mm centres, to be designed in accordance with SANS 10400, SANS10160 and NBR.	703
703.2	Min. 1000mm high balustrade wall plastered and painted. In accordance to SANS 10400-D	703
703.3	Min. 1000mm high toughened safety glass balustrade. In accordance to SANS 10400-D 	703
704	Fire Smoke Detector to Fire Specialist Specifications	700
705	Fire Equipments to Fire Specialist Specifications	700
801	Aerofoil louver screen system by manufacturers specifications	800
802	Fixed Powder Coated Aluminium Screen by specialist	800
803	Fixed powder coated aluminium pergola by specialist	800
804	Fixed Louvre (75x3mm dia. galv. circular hollow steel tubing fixed to steel beams) to specialist details	800
805	Helios Canopy Steel Louvre Awning system (or similar approved) to manufacturers specifications	800
901	Hulabond wall cladding system with horizontal slits to architects design and manufacturers specfications	900
1000.1	Gutters	1000
1000.1.1	PVC Gutter with 75mm Dia PVC Rainwater Downpipe by specialist.	1000.1
1000.2	Drainage	1000
1000.2.1	Sormwater manhole to engineers details	1000.2
1000.2.2	Stormwater FBO to engineers details	1000.2
1000.2.3	110mm Dia stormwater downpipe enbedded in concrete column	1000.2
1000.2.4	3mm+4mm Approved Torch-on + 1 layer 'Interdek' protection/slip sheet (loose laid)	1000.2
1000.2.5	Stormwater Attenuation Tank to Engineer's Details and Specifications	1000.2
1000.2.6	Stormwater Channel to Engineer's Details and Specifications	1000.2
1000.2.7	Stormwater Drain to Engineer's Details and Specifications	1000.2
1100.1	DB Board by Electrical Engineer	1100
1100.2	Lighting by Electrical Engineer	1100
1100.3	Switches by Electrical Engineer	1100
1100.4	Plug Points by Electrical Engineer	1100
1100.5	Telephone/Data Points by Electrical Engineer	1100
F0	Exposed Structure Nil finish	F
F1	Carpet  As Per Finishing Schedule.	F
F1.1	Carpet Floor Finish As Per Finishing Schedule.	F1
F1.2	Carpet Floor finish On Raised Floor by specialist And As Per Finishing Schedule.	F1
F2	600mm x 600mm Porcelain Tile(Light Grey) As Per Finishing schedule.	F
F2.1	300mm x 600mm Porcelain Tile(Dark Grey) As Per Finishing schedule.	F2
F2.2	150mm x 300mm Porcelain Tile(Dark Grey) As Per Finishing schedule	F2
F3	Epoxy Floor Finish	F
F3.1	Epoxy Floor Finish Type 1 As Per Finishing Schedule.	F3
F3.2	Epoxy Floor Finish Type 2 As Per Finishing Schedule.	F3
F3.3	Epoxy Floor Finish Type 3 As Per Finishing Schedule.	F3
F3.4	Pro-Struct 618R Expoxy Resin Grouting Compound Base below kerb By Specialist & As Per Finishing Schedule.	F3
F4	300mm x 300mm Porcelain Tile(Light Grey) As Per Finishing schedule.	F4
F5	30mm Screed As Per Finishing Schedule.	F
F6	Clay Paving As Per Finishing Schedule.	F
F7	Tarmacadam on Layerworks As Per Finishing Schedule.	F
F8	Power floated concrete As Per Finishing Schedule.	F
F9	Porcelain Tiles As Per Finishing Schedule.	F
F10	Polished Concrete As Per Finishing Schedule.	F
F11	Bosson Pavers As Per Finishing Schedule.	F
F12	Corbrick Paving As Per Finishing Schedule.	F
F13	Precast Concrete As Per Finishing Schedule.	F
F14	Galvanised Finish On Steel  Engineer Specification.	F
F15	Galvanised Finish On Mentis Grating To Engineer Specifications.	F
F16	30mm Screed As Per Finishing Schedule.	F
F17	Stone Chips  As Per Finishing Schedule.	F
F18	Vinyl Floor Finsih As Per Finishing Schedule.	F
F18.1	Floorworx Vinyl Floor Finsih On Raised Floor by specialis and As Per Finishing Schedule.	F18
F18.2	SuperFlex Vinyl Floor Finsih As Per Finishing Schedule.	F18
S1	5mm Thick x 75mm high Flowcrete Skirting As Per Finishing Schedule.	S
S2	100mm High Porcelain Tile Skirting  As Per  Finishing Schedule.	S
S3	100mm High Granolithic Skirting As Per Finishing schedule.	S
S4.1	100mm x 20mm Painted PINE SPAR Skirting As Per Finishing schedule.	S
S4.2	Auditorium Timber Skirting To Be Confirmed & As Per Finishing schedule.	S
S5	75mm x 3mm thick ANODISED ALUMINIUM Skirting As Per Finishing schedule.	S
S6	PLATINIUM PVC powerskirting (BLACK) As Per Finishing schedule.	S
W0	Off Shutter Concrete To Engineers Details.	W
Wp	Maximum 10mm Thick Plaster On Brickwork By Specialist.	W
W1	Plaster And Painted wall As Per Finishing schedule.	W
W1.0	Flushed Jointed Clay Stock Face Brick As Per Finishing schedule.	W
W1.1	Plaster And Paint (Interior) As Per Finishing schedule.	W
W1.2	Plaster And Paint (Exterior) As Per Finishing schedule.	W
W1.3	Facebrick Wall As Per Finishing schedule.	W
W1.4	Concrete Look Alike Finished Brickwork As Per Finishing schedule.	W
W2	Porcelain Tile Wall As Per Finishing schedule.	W
W2.1	300mm x 600mm Porcelain Wall tile(White Color) As Per Finishing schedule.	W2
W2.2	300mm x 600mm Porcelain Wall tile(Dark Grey color) As Per Finishing schedule.	W2
W2.3	150mm x 300mm Porcelain Wall tile(Dark Grey color) As Per Finishing schedule.	W2
W2.4	100mm x 200mm Porcelain Wall Tile(Black) SPAR As Per Finishing schedule.	W2
W2.5	300mm x 600mm Porcelain Wall Tile(Light Grey) As Per Finishing schedule.	W2
W2.6	300mm x 600mm Porcelain Wall Tile(Black) SPAR ABLUTION As Per Finishing schedule.	W2
W3	Timber Slats By Specialist	W
W4	Off Shutter Concrete To Engineers Details.	W
W5	Ceramic Wall Tile As Per Finishing schedule.	W
W5.1	200mm x 230mm Ceramic Tile(Black) As Per Finishing schedule.	W5
W5.2	200mm x 230mm Ceramic Tile(White) As Per Finishing schedule.	W5
W5.3	200mm x 230mm Ceramic Tile(Light Grey) As Per Finishing scehdule.	W5
W5.4	200mm x 200mm Ceramic Johnson Tile(White) As Per Finishing schedule.	W5
WF	Fire rated walls By Specialist.	WT
WF.1	Min 440mm Thick 4HR Fire Rated Wall. Plaster And Painted As Per Finishing schedule.	WF
WE	Epoxy Return As Per Finishing schedule.	WT
WE.1	Epoxy Type 1 Return As Per Finishing Schedule.	WE
WE.2	Epoxy Type 2 Return As Per Finishing Schedule.	WE
WE.3	Epoxy Type 3 Return As Per Finishing Schedule.	WE
WA	Epoxy Return As Per Finishing schedule.	WT
WA.1	Acoustic Rear Wall Panel Custom Made By Specialist And All As Per Nedbank Specification Documents.	WA
WA.2	Angled Sound Deflecting Wall Panels With LED Lights within Units By Specialist And All As Per Nedbank Specification Documents.	WA
WA.3	Acoustic Panel:Ecophon,Akusto one 1200mm L x 600mm W x 40mm T suspended at angle with connect one trim and connect absorber anchor one By Specialist And As Per Nedbank Specification Documents.	WA
CR1	Shadow Line Cornice As Per Data Sheet	CR
C0	Exposed Structure / Off Shuter Soffit (Nil Finish).	C
C1	Exposed Structure Painted As Per Finishing schedule.	C
C2	Flushed Plastered Ceiling As Per Finishing schedule.	C
C2.1	Supply and install 3600mm JUMBO Main Tees at 1200mm centres in one direction and 1200mm JUMBO Cross Tees at  400mm centres perpendicular to Main Tees.  Main Tees to be suspended at 1200mm centres by means of 25 x 25 x 0.6mm galvanised steel angle, hangers fixed to bulb of Main Tee with wafer tek screws/steel pop rivets and to slab with 6 x 30mm express nails and washers.   Fit 9mm JUMBO Plasterboard to the underside of grid system with square edge of board facing down with 25mm Drywall Screws at 150mm centres.	C2
C2.2	Fix one layer of 9mm JUMBO Plasterboard to JUMBO Steel Brandering installed at maximum 400mm centres. Fix JUMBO Plasterboard using 25mm JUMBO Drywall Screws at maximum 150mm centres. All joints shall be staggered.  Ceiling grid consisting of JUMBO Suspension Brackets (150/300mm) fixed to tie beam/joist using 35mm JUMBO Drywall Course Thread Screws. Install 25 x 25mm Galvanised Steel Angle at ceiling level to the wall.  Install JUMBO Steel Brandering onto the suspension brackets. Fix JUMBO Steel Brandering to the galvanised steel angle using 13mm Wafer Tek Screws.	C2
C2.3	Supply and install 3600mm JUMBO Main Tees at 1200mm centres in one direction and 1200mm JUMBO Cross Tees at  600mm centres perpendicular to Main Tees.  Main Tees to be suspended at 1200mm centres by means of 25 x 25 x 0.6mm galvanised steel angle, hangers fixed to bulb of Main Tee with Wafer Tek screws/steel Pop Rivets and to slab with 6 x 30mm Express Nails and Washers.	C2
C2.4	Fix one layer of 12mm JUMBO Plasterboard to JUMBO Steel Brandering installed at maximum 500mm centres. Fix JUMBO Plasterboard using 25mm JUMBO Drywall Screws at maximum 150mm centres. All joints shall be staggered.  Ceiling grid consisting of JUMBO Suspension Brackets (150/300mm) fixed to tie beam/joist using 35mm JUMBO Drywall Course Thread Screws. Install 25 x 25mm Galvanised Steel Angle at ceiling level to the wall.  Install JUMBO Steel Brandering onto the suspension brackets. Fix JUMBO Steel Brandering to the galvanised steel angle using 13mm Wafer Tek Screws.	C2
C2.5	Supply and install 3600mm JUMBO Main Tees at 1200mm centres in one direction and 1200mm JUMBO Cross Tees at  500mm centres perpendicular to Main Tees.  Main Tees to be suspended at 1200mm centres by means of 25 x 25 x 0.6mm galvanised steel angle, hangers fixed to bulb of Main Tee with wafer tek screws/steel pop rivets and to slab with 6 x 30mm express nails and washers.	C2
C2.6	Fix one layer of 12mm JUMBO Moisture Plasterboard to JUMBO Steel Brandering installed at maximum 500mm centres. Fix JUMBO Plasterboard using 25mm JUMBO Drywall Screws at maximum 150mm centres. All joints shall be staggered.  Ceiling grid consisting of JUMBO Suspension Brackets (150/300mm) fixed to tie beam/joist using 35mm JUMBO Drywall Course Thread Screws. Install 25 x 25mm Galvanised Steel Angle at ceiling level to the wall.  Install JUMBO Steel Brandering onto the suspension brackets. Fix JUMBO Steel Brandering to the galvanised steel angle using 13mm Wafer Tek Screws.	C2
C3	Grid Ceiling As Per Finishing Schedule.	C
C3.1	Supply and install Pelican Systems Knauf Ceiling Solutions (KCS) Thermatex Star ceiling tiles size (1200 x 600) or (600 x 600) x 15mm laid onto Pelican Systems econogrid consisting of econogrid. Space econogrid Main Tees at 1200mm centres. Suspend Main Tees using 2.5mm thick pre-stretched Galvanised Hanger Wire or 19mm Hanger Strap at 1200mm centres. Galvanised Hanger Wire shall be put through the Main Tees hole and wound three times around itself. Two Steel Pop Rivets or one 13mm Wafer Tek Screw shall be used to fix the Hanger Strap to the Main Tees bulb	C3
C3.1.	Supply and install Pelican Systems Vinyl or Pelican Systems Knauf Ceiling Solutions (KCS) ceiling tiles sizes (1200 x 600mm) or (600 x 600mm) x 9 / 12 / 15mm, laid onto Pelican Systems econogrid consisting of econogrid. Space econogrid Main Tees at 1200mm centres. Suspend Main Tees using 2.5mm thick pre-stretched Galvanised Hanger Wire or 19mm Hanger Strap at 1200mm centres. Galvanised Hanger Wire shall be put through the Main Tees hole and wound three times around itself. Two Steel Pop Rivets or one 13mm Wafer Tek Screw shall be used to fix the Hanger Strap to the Main Tees bulb	C3
C3.2	600 x 1200mm Suspended Grid Ceiling As Per Finishing Schedule.	C3
C3.3	Supply and install Pelican Econotile Gypsum ceiling tiles size 1200 x 600mm (or 600 x 600mm) x 9mm with White  vinyl face finish and aluminium foil backing laid onto Pelican Systems econogrid consisting of econogrid Wall Angle (standard / shadowline) fixed to the perimeter wall using fixings at 400mm centres. Space econogrid Main Tees at 1200mm centres. Suspend Main Tees using 2.5mm thick pre-stretched Galvanised Hanger Wire or 19mm Hanger Strap at 1200mm centres. Galvanised Hanger Wire shall be put through the Main Tees hole and wound 	C3
C3.6	600 x 1200mm Suspended Grid Ceiling(postnet) As Per Finishing Schedule.	C3
C3.7	Supply and install Pelican AMF Mercure ceiling tiles size (1200 x 600) or (600 x 600) x 15mm laid onto Pelican Systems econogrid consisting of econogrid Wall Angle (standard / shadowline) fixed to the perimeter wall using fixings at 400mm centres. Space econogrid Main Tees at 1200mm centres. Suspend Main Tees using 2.5mm thick pre-stretched Galvanised Hanger Wire or 19mm Hanger Strap at 1200mm centres. Galvanised Hanger Wire shall be put through the Main Tees hole and wound three times around itself. Two Steel Pop Rivets or one 13mm Wafer Tek Screw shall be used to fix the Hanger Strap to the Main Tees bulb	C3	
C3.8	Supply and install Pelican AMF Fine Stratos Micro ceiling tiles size (1200 x 600) or (600 x 600) x 15mm laid onto Pelican Systems econogrid consisting of econogrid Wall Angle (standard / shadowline) fixed to the perimeter wall using fixings at 400mm centres. Space econogrid Main Tees at 1200mm centres. Suspend Main Tees using 2.5mm thick pre-stretched Galvanised Hanger Wire or 19mm Hanger Strap at 1200mm centres. Galvanised Hanger Wire shall be put through the Main Tees hole and wound three times around itself. Two Steel Pop Rivets or one 13mm Wafer Tek Screw shall be used to fix the Hanger Strap to the Main Tees bulb	C3
C3.9	Supply and install Pelican AMF Thermofon White  ceiling tiles size (1200 x 600) or (600 x 600) x 15mm laid onto Pelican Systems econogrid consisting of econogrid Wall Angle (standard / shadowline) fixed to the perimeter wall using fixings at 400mm centres. Space econogrid Main Tees at 1200mm centres. Suspend Main Tees using 2.5mm thick pre-stretched Galvanised Hanger Wire or 19mm Hanger Strap at 1200mm centres. Galvanised Hanger Wire shall be put through the Main Tees hole and wound three times around itself. Two Steel Pop Rivets or one 13mm Wafer Tek Screw shall be used to fix the Hanger Strap to the Main Tees bulb	C3
C3.10	Supply and install Pelican AMF Thermofon Black ceiling tiles size (1200 x 600) or (600 x 600) x 15mm laid onto Pelican Systems econogrid black consisting of econogrid Wall Angle (standard / shadowline) fixed to the perimeter wall using fixings at 400mm centres. Space econogrid Main Tees at 1200mm centres. Suspend Main Tees using 2.5mm thick pre-stretched Galvanised Hanger Wire or 19mm Hanger Strap at 1200mm centres. Galvanised Hanger Wire shall be put through the Main Tees hole and wound three times around itself. Two Steel Pop Rivets or one 13mm Wafer Tek Screw shall be used to fix the Hanger Strap to the Main Tees bulb	C3
C3.11	Supply and install Pelican Econocal Calcium Silicate ceiling tiles size 1200 x 600 x 6mm with White vinyl face finish and aluminium foil backing laid onto Pelican Systems econogrid consisting of econogrid Wall Angle (standard / shadowline) fixed to the perimeter wall using fixings at 400mm centres. Space econogrid Main Tees at 1200mm centres. Suspend Main Tees using 2.5mm thick pre-stretched Galvanised Hanger Wire or 19mm Hanger Strap at 1200mm centres. Galvanised Hanger Wire shall be put through the Main Tees hole and wound three times around itself. Two Steel Pop Rivets or one 13mm Wafer Tek Screw shall be used to fix the Hanger Strap to the Main Tees bulb	C3
C3.12	Supply and install Pelican Econocal Calcium Silicate ceiling tiles size 1200 x 600 x 6mm with White vinyl face finish and aluminium foil backing laid onto Pelican Systems econogrid consisting of econogrid Wall Angle (standard / shadowline) fixed to the perimeter wall using fixings at 400mm centres. Space econogrid Main Tees at 1200mm centres. Suspend Main Tees using 2.5mm thick pre-stretched Galvanised Hanger Wire or 19mm Hanger Strap at 1200mm centres. Galvanised Hanger Wire shall be put through the Main Tees hole and wound three times around itself. Two Steel Pop Rivets or one 13mm Wafer Tek Screw shall be used to fix the Hanger Strap to the Main Tees bulb	C3
C3.13	Supply and install Pelican Econotile Gypsum ceiling tiles size 1200 x 600mm (or 600 x 600mm) x 12mm with white vinyl face finish and aluminium foil backing laid  onto Pelican Systems econogrid consisting of econogrid Wall Angle (standard / shadowline) fixed to the perimeter wall using fixings at 400mm centres. Space econogrid Main Tees at 1200mm centres. Suspend Main Tees using 2.5mm thick pre-stretched Galvanised Hanger Wire or 19mm Hanger Strap at 1200mm centres. Galvanised Hanger Wire shall be put through the Main Tees hole and wound three times around itself. Two Steel Pop Rivets or one 13mm Wafer Tek Screw shall be used to fix the Hanger Strap to the Main Tees bulb	C3
C3.14	Supply and install Pelican Econotile Gypsum ceiling tiles size 1200 x 600mm (or 600 x 600mm) x 9 mm with Fissured vinyl face finish and aluminium foil backing laid  onto Pelican Systems econogrid consisting of econogrid Wall Angle (standard / shadowline) fixed to the perimeter wall using fixings at 400mm centres. Space econogrid Main Tees at 1200mm centres. Suspend Main Tees using 2.5mm thick pre-stretched Galvanised Hanger Wire or 19mm Hanger Strap at 1200mm centres. Galvanised Hanger Wire shall be put through the Main Tees hole and wound three times around itself. Two Steel Pop Rivets or one 13mm Wafer Tek Screw shall be used to fix the Hanger Strap to the Main Tees bulb	C3
C3.15	Supply and install Pelican Econotile Gypsum ceiling tiles size 1200 x 600mm (or 600 x 600mm) x 9mm with Black vinyl face finish and aluminium foil backing laid  onto Pelican Systems econogrid consisting of econogrid Wall Angle (standard / shadowline) fixed to the perimeter wall using fixings at 400mm centres. Space econogrid Main Tees at 1200mm centres. Suspend Main Tees using 2.5mm thick pre-stretched Galvanised Hanger Wire or 19mm Hanger Strap at 1200mm centres. Galvanised Hanger Wire shall be put through the Main Tees hole and wound three times around itself. Two Steel Pop Rivets or one 13mm Wafer Tek Screw shall be used to fix the Hanger Strap to the Main Tees bulb	C3
C3.16	Supply and install Pelican Heradesign ceiling tiles size (1200 x 600) or (600 x 600) x 15mm laid onto Pelican Systems econogrid consisting of econogrid Wall Angle (standard / shadowline) fixed to the perimeter wall using fixings at 400mm centres. Space econogrid Main Tees at 1200mm centres. Suspend Main Tees using 2.5mm thick pre-stretched Galvanised Hanger Wire or 19mm Hanger Strap at 1200mm centres. Galvanised Hanger Wire shall be put through the Main Tees hole and wound three times around itself. Two Steel Pop Rivets or one 13mm Wafer Tek Screw shall be used to fix the Hanger Strap to the Main Tees bulb	C3
C4	Bulkhead Ceiling As Per Finishing Schedule and To Later Detail. 	C
C4.1	Type 1 Bulkhead Ceiling As Per Finishing Schedule and To Later Detail. 	C4
C4.2	Type 2 Bulkhead Ceiling As Per Finishing Schedule and To Later Detail. 	C4
C4.3	Acoustic Bulkhead:Ecophon,solo-rectangular 2400mm L x 1200mm W x 40mm T suspended at angle with connect adjustable wire hanger and connect absorber anchor x2 panels(2000mm X 1200mm) cut and installed flush to each other By Specialist And As Per Nedbank Specification Documents. 	C4
C4.4	Pelican Systems JUMBO flush plastered bulkheads with 9mm thick tapered edge plasterboard fixed at right angles to 35mm JUMBO galvanised steel main and Cross Tees at 300mm centres, using 25mm Drywall Screws at 150mm centres. All joints to be taped and plastered with JUMBO Skimming Plaster and prepared for decoration, all in accordance with the manufacturer's instructions. 	C4
201.13	Glazed Aluminium Sliding Doors by Specialist to Door Schedule to comply with SANS 10400-N and AAAMSA Regulations. Colour Charcoal and Glazing to be in Accordance with SANS 10400-N	201
-.1	to Engineer's Details and Specifications.	-
-.2	All in Accordance to SANS 10400-B,SANS 10400-D,SANS 10400-M & SANS 10400-T.	-
-.3	by Specialist to Door Schedule to comply with SANS 10400-N and AAAMSA Regulations.	-
-.4	by Specialist to Glazing Schedule to comply with SANS 10400-N and AAAMSA Regulations.	-
-.5	by Specialist.	-
-.6	to Manufacturer's Specification.	-
-.7	as per Finishing Schedule.	-
-.8	as per Sanitary Schedule.	-
-.3.1	by Specialist to Door Schedule.	-
-.9	to Later Detail.	-
201.14	Automated Horizontal Slatted Timber Garage Door By Specialist	201
104.10	Textured Plaster Band by Specialist. Colour to Palm Lakes Spec.	104
806	Hardwood Balau Timber Screen by Specialist.	800
807	Hardwood Balau Timber Pergola by Specialist.	800
104.11	Textured Plaster Band by Specialist. Colour to Client Spec.	104
703.4	Min. 1000mm high Galvanised Steel balustrade to engineers details. In accordance to SANS 10400-D	703
102.4	220mm Concrete flat roof to engineers detail, with Derbigum waterproofing & screed to fall to Fullbore outlets with a min fall of 1:100. 40mm thick Isoboard to be laid and finished with crushed stone.	102
105.6	Concrete Stair to engineers details. Treads @ 280mm, Risers @ 167mm. All in accordance to SANS 10400-B,SANS 10400-D,SANS 10400-M & SANS 10400-T	105
101.4	Existing Concrete Foundations to Engineer's Details and Specifications	101
104.8	Existing Structural Retaining Wall to engineers detail	104
703.5	Minimum 1m High Post and Rail Fence to comply with SANS 10400-D	703
1000.2.8	DPC Underlay beneath surface bed/retaining wall by specialist to comply with SANS 10400-J	1000.2
1000.2.9	Agricultural Stormwater Drain to Engineer's Details and Specifications	1000.2
PW01	Pelican Systems JUMBO DryWALL 51/30 with overall thickness of 76mm comprising internal framing formed of 51mm galvanised steel Studs fixed at 600mm centres to galvanised steel top and bottom Track,  including any additional steel Studding necessary at door openings, glazed or other apertures, abutments, ends, corners, etc. and covered with 12mm thick JUMBO Plaster Boards in single lengths to suit height, butt jointed and secured to Studding with 25mm Drywall Screws at maximum 220mm centres, the joints taped over and flushed over with jointing compound prepared for painting.	PW
PW02	Pelican Systems JUMBO DryWALL 51/30 with overall thickness of 76mm comprising internal framing formed of 51mm galvanised steel Studs fixed at 600mm centres to galvanised steel top and bottom Track with 51mm thick JUMBO SoundTherm Insulation in the cavity of the of the partition, including any additional steel Studding necessary at door openings, glazed or other apertures, abutments, ends, corners, etc. and covered with 12mm thick JUMBO Plaster Boards in single lengths to suit height, butt jointed and secured to Studding with 25mm Drywall Screws at maximum 220mm centres, the joints taped over and flushed over with jointing compound prepared for painting.	PW
PW03	Pelican Systems JUMBO MoistureWALL 51/30 with overall thickness of 76mm comprising internal framing formed of 51mm galvanised steel Studs fixed at 600mm centres to galvanised steel top and bottom Track with 51mm thick JUMBO SoundTherm Insulation of in the cavity of the of the partition, including any additional steel Studding necessary at door openings, glazed or other apertures, abutments, ends, corners, etc. and covered with 12mm thick JUMBO Moisture Boards in single lengths to suit height, butt jointed and secured to Studding with 25mm Drywall Screws at maximum 220mm centres, the joints taped over and flushed over with jointing compound prepared for painting.	PW
PW04	Pelican Systems JUMBO DryWALL 63/30 with overall thickness of 89mm comprising internal framing formed of 63mm galvanised steel Studs fixed at 600mm centres to galvanised steel top and bottom Track, including any additional steel Studding necessary at door openings, glazed or other apertures, abutments, ends, corners, etc. and covered with 12mm thick JUMBO Plaster Boards in single lengths to suit height, butt jointed and secured to Studding with 25mm Drywall Screws at maximum 220mm centres, the joints taped over and flushed over with jointing compound prepared for painting.	PW
PW05	Pelican Systems JUMBO DryWALL 63/30/S44 with overall thickness of 89mm comprising internal framing formed of 63mm galvanised steel Studs fixed at 600mm centres to galvanised steel top and bottom Track with 63mm thick JUMBO SoundTherm Insulation in the cavity of the of the partition, including any additional steel Studding necessary at door openings, glazed or other apertures, abutments, ends, corners, etc. and covered with 12mm thick JUMBO plasterboards in single lengths to suit height, butt jointed and secured to Studding with 25mm JUMBO Drywall Screws at maximum 220mm centres, the joints taped over and flushed over with JUMBO jointing compound prepared for painting	PW
AP01	Bottom Hung Access Panel. Extra over ceiling for Pelican Bottom Hung Access Panel comprising matt white powder coated aluminium Access Panel 580 x 580mm. Powder Coated white bottom hinged fitted flush to ceiling with and including screw fixing through stalk of Access Panel into JUMBO Grid.	AP
AP02	In Lay Access Panel. Extra over ceiling for Pelican In Lay Access Panel comprising matt white powder coated aluminium Access Panel 580 x 580mm. Powder coated white bottom loose and fitted flush to ceiling with and including screw fixing through stalk of Access Panel into JUMBO Grid.	AP
AP03	Top Hung Access Panel. Extra over ceiling for Pelican Top Hung Access Panel comprising matt white powder coated aluminium Access Panel 580 x 580mm. Powder coated white bottom loose and fitted flush to ceiling with and including screw fixing through stalk of Access Panel into JUMBO Grid.	AP
AP04	Flushline Outer Frame. Extra over ceiling for Flush Line Access Panel comprising matt white powder coated aluminium Access Panel 580 x 580mm. Primed white bottom hinged fitted flush to ceiling with and including screw fixing through stalk of Access Panelinto JUMBO Grid.	AP
PW08	Pelican Systems JUMBO FireWALL 63/30/S44 with overall thickness of 93mm comprising internal framing formed of 63mm galvanised steel Studs fixed at 600mm centres to galvanised steel top and bottom Track with 63mm thick JUMBO SoundTherm Insulation to be installed in the cavity, including any additional steel Studding necessary at door openings, glazed or other apertures, abutments, ends, corners, etc. and covered with 15mm thick JUMBO FR plasterboards in single lengths to suit height, butt jointed and secured to Studding with 25mm JUMBO Drywall Screws at maximum 220mm centres, the joints taped over and flushed over with JUMBO jointing compound prepared for painting.	PW
PW06	Pelican Systems JUMBO MoistureWALL 63/30/S44 with overall thickness of 89mm comprising internal framing formed of 63mm galvanised steel Studs fixed at 600mm centres to galvanised steel top and bottom Track with 63mm thick JUMBO SoundTherm Insulation in the cavity of the of the partition, including any additional steel Studding necessary at door openings, glazed or other apertures, abutments, ends, corners, etc. and covered with 12mm thick JUMBO Moisture Plasterboards in single lengths to suit height, butt jointed and secured to Studding with 25mm JUMBO Drywall Screws at maximum 220mm centres, the joints taped over and flushed over with JUMBO jointing compound prepared for painting	PW
PW07	Pelican Systems JUMBO® FireWall 63/60 with overall thickness of 93mm, with 63mm JUMBO® Studs at 600mm centres friction fitted into head Track and floor Track and clad on both sides with a single layer of 15mm thick Fire Resistant JUMBO® Board fixed at 220mm centres using 25mm Drywall Screws. All exterior joints to be covered with JUMBO® Tape and finished with two layers of JUMBO® Jointing Plaster	PW
PW09	Pelican Systems JUMBO FireWALL 63/120 with overall thickness of 124mm, with 63 x 35mm JUMBO Studs at 600mm centres friction fitted into head Track and floor Track and clad on both sides with a double layer of 15mm thick Fire Resistant JUMBO Plasterboard fixed at 220mm centres using 25mm JUMBO Drywall Screws on the base layer and 41mm JUMBO Drywall Screws on the face layer, all plasterboard joints must overlap. All exterior joints to be covered with JUMBO Tape and finished with two layers of JUMBO Jointing Plaster applied and lightly sanded down, leaving wall surface prepared for painting, all in accordance with the supplier’s recommendations.	PW
PW10	Pelican Systems JUMBO FireWALL 63/120/S50 with overall thickness of 124mm, with 63 x 35mm JUMBO Studs at 600mm centres friction fitted into head Track and floor Track and clad on both sides with a double layer of 15mm thick Fire Resistant JUMBO Plasterboard fixed at 220mm centres using 25mm JUMBO Drywall Screws on the base layer and 41mm JUMBO Drywall Screws on the face layer, all plasterboard joints must overlap. All exterior joints to be covered with JUMBO Tape and finished with two layers of JUMBO Jointing Plaster applied and lightly sanded down, leaving wall surface prepared for painting, all in accordance with the supplier’s recommendations. A 63mm thick JUMBO SoundTherm Insulation to be installed in the cavity.	PW
PW11	Pelican Systems JUMBO AcousticWALL 102/120/S50 with overall thickness of 162mm, with 102 x 35mm JUMBO Studs at 600mm centres friction fitted into head Track and floor Track and clad on both sides with a double layer of 15mm thick Fire Resistant JUMBO Plasterboard fixed at 220mm centres using 25mm JUMBO Drywall Screws on the base layer and 41mm JUMBO Drywall Screws on the face layer, all plasterboard joints must overlap. All exterior joints to be covered with JUMBO Tape and finished with two layers of JUMBO Jointing Plaster applied and lightly sanded down, leaving wall surface prepared for painting, all in accordance with the supplier’s recommendations. A 102mm thick JUMBO SoundTherm Insulation to be installed in the cavity.	PW
PW12	Pelican Systems JUMBO SecurityWALL 63/60 with overall thickness of 93mm, with 63 x 35mm JUMBO Studs at 600mm centres friction fitted into head Track and floor Track and clad on both sides with a single layer of 15mm thick JUMBO Fire Plasterboard fixed at 220mm centres using 25mm JUMBO Drywall Screws, all plasterboard joints must overlap. 0.5mm Galvanised sheet to be used behind the 15mm JUMBO Plasterboard on one side (Impact Side).  All exterior joints to be covered with JUMBO Tape and finished with two layers of JUMBO Jointing Plaster applied and lightly sanded down, leaving wall surface prepared for painting, all in accordance with the supplier’s recommendations.	PW
TR02-A	PS2 Plaster Trim Internal Corner 25 x 20. Supply and install Pelican PS2 Plaster Trim Internal Corner pre-drilled & pre-painted aluminium white Shadowline Wall Trim to perimeter of rooms fixed at 50mm from end.	TR02
TR02-B	PS2 Plaster Trim External Corner 25 x 20. Supply and install Pelican PS2 Plaster Trim External Corner pre-drilled & pre-painted aluminium white Shadowline Wall Trim to perimeter of rooms fixed at 50mm from end.	TR02
TR04-A	PS3 Plaster Trim Internal Corner 45 x 20. Supply and install Pelican PS3 Plaster Trim Internal Corner pre-drilled & pre-painted aluminium white Shadowline Wall Trim to perimeter of rooms fixed at 50mm from end.	TR04
TR04-B	PS3 Plaster Trim External Corner 45 x 20. Supply and install Pelican PS3 Plaster Trim External Corner pre-drilled & pre-painted aluminium white Shadowline Wall Trim to perimeter of rooms fixed at 50mm from end.	TR04
TR05-A	PS4 Plaster Trim Internal Corner 45 x 45. Supply and install Pelican PS4 Plaster Trim Internal Corner pre-drilled & pre-painted aluminium white Shadowline Wall Trim to perimeter of rooms fixed at 50mm from end.	TR05
TR05-B	PS4 Plaster Trim External Corner 45 x 45. Supply and install Pelican PS4 Plaster Trim External Corner pre-drilled & pre-painted aluminium white Shadowline Wall Trim to perimeter of rooms fixed at 50mm from end.	TR05